China Factory Light Prefab Building Warehouse Steel Structure Prefabricated Workshop for Sale

Products

China Factory Light Prefab Building Warehouse Steel Structure Prefabricated Workshop for Sale

China Factory Light Prefab Building Warehouse Steel Structure Prefabricated Workshop for Sale

Package Size 50.00cm * 50.00cm * 20.00cm Package Gross Weight 50.000kg Director Group steel structure warehouse building

Send your inquiry

DESCRIPTION

Basic Info.
Model NO. DFX08
Customized Customized
Color Customized Color
Window Aluminum Window
Door Steel Door
Brand Dfx
Transport Package as Request
Specification Customized
Trademark DFX
Origin Shandong, China Mainland
HS Code 9406000090
Production Capacity 500 Units Per Month
Packaging & Delivery
Package Size 50.00cm * 50.00cm * 20.00cm Package Gross Weight 50.000kg
Product Description

Director Group steel structure warehouse building has features of high fire resistance, strong corrosion resistance. Steel structure warehouse is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.Each component using welds, bolts or rivets to connect.

The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.

The usage scale includes large-scale workshop, or warehouse, supermarkets, entertainment centers and modular steel structure garage.

Item Name

steel structure warehouse

Size

Length, Width, Roof height, and Eave Height

Roof and Wall

PU, EPS, Rock Wool sandwich panel

Door and Window

PVC or Aluminum Alloy

Column and Beam

Hot rolled H section, I section or Galvanized

Purlin

C-Section and Z-section

Surface

2 primer and 1 finished paint

Local Climate

1.wind speed 2.Rain load 3.Snow load 4.Earthquake grade if have etc.

Crane parameter

If need crane beam, the parameter is in need.

Drawing

1.quote as clients' drawing

2.Design as per clients' requests and quote.

Package

standard packing or as request

Load-in

20GP, 40GP, 40OT


Overseas projects we undertook in the last few years

Industrial Warehouse (13000 m²)-Argentina

Warehouse (14000m²) -Republic of Uzbekistan

Workshop (12000m²) -Canada

Warehouse(3600m²) -Romania

Vegetable Market(2500m²) -Mauritius

Pig shed(3500m²) -USA

Chicken shed(2800m²)-Australia

Aircraft Hangar(1300m²) -Australia

Warehouse(900m²) -Mongolia

Prefabricated house(70m²) -800 sets-Angola

Container house (20') -60 sets -South Africa

China Factory Light Prefab Building Warehouse Steel Structure Prefabricated Workshop for Sale


China Factory Light Prefab Building Warehouse Steel Structure Prefabricated Workshop for Sale


FAQ

1. How to buy your ideal products?

A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, 50% balance before loading by TT.

2. What is the delivery time?

A: It depends on the order quantities. Generally speaking, the delivery time will be within 15 to 40 days.

3. How to pack the products?

A: We use a standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

4. How to install the goods arriving destination?

A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.